Energy is essential to improving people’s quality of life. Essential to economies. Essential to mobility. Essential to improving health and education. ExxonMobil has a responsibility to provide affordable, reliable energy. It’s a responsibility we take seriously. But we can’t stop there. There’s a dual challenge facing our industry: meeting growing demand for energy, while at the same time reducing environmental impacts – including the risks of climate change. It’s a challenge our industry must help solve. ExxonMobil is committed to doing our part.
Innovation enables us to invest in high-quality opportunities to enhance our asset portfolio. Our relentless focus on operational excellence enables us to get the most out of each and every facility, every hour, every day.
A safe company is a well-run company. Achieving safe and environmentally responsible operations across a global enterprise requires a significant commitment from everyone at all levels of the organization. Success in safety is the result of a disciplined, rigorous approach, which also helps drive more reliable operations and improves financial results.
Our global LNG position is unmatched in the industry. We have interest in several LNG developments around the world, with net interest capacity of 22 million tonnes annually. Our entry into the deepwater Area 4 block offshore Mozambique, containing an estimated 85 trillion gross cubic feet of natural gas in-place, was also completed in 2017. This resource will support an ExxonMobil-led, world-class LNG development, with potential capacity ultimately exceeding 40 million tonnes per year.
Rovuma LNG Phase 1 venture overview
The deepwater Area 4 block off the coast of Mozambique contains ~ 80 trillion cubic feet of natural gas, capable of providing resources for multiple world-class LNG projects.
Rovuma LNG is a landmark energy project positioned to accelerate Mozambique’s economic transformation. At the Final Investment Decision (FID), RLNG Phase 1 will be the largest private investment in Africa’s history and operated by ExxonMobil Moçambique, Limitada.
The Afungi onshore plant deploys an innovative 18.6 MTA electric LNG (eLNG) concept, reducing GHG emissions up to 40% compared with traditional mega-trains, based on RLNG FEED design, while enabling scalable expansion.
Delivering this capacity for target startup of 2030 requires:
18
12
One
~50 km
The venture aims to:
-
Engage ~7,500 Mozambicans
during the execution phase -
Create ~700 jobs
during the operations phase -
Supply up to 500 MMSCFD
of gas domestically
The Rovuma LNG Project will prioritize Local Content by aiming to maximize the use of local goods and services and developing our workforce with technical and professional skills to support the Project and the broader economy.
Over its life, Phase 1 is expected to generate over $140 billion in government revenue — strengthening health, education, and infrastructure, and positioning Mozambique among the world’s top-five LNG exporters by 2040.
Execution and modularization
Midstream execution and modular construction
Modular development increases certainty in execution schedule and reduces risks. Modular structures containing piping, equipment, electrical and instrumentation cabling, and buildings will be fabricated overseas and transported via Heavy Lift Vessels or barges to the construction site at Afungi. Modules will be offloaded at the MOF (Material Offloading Facility) and moved to the site using Self-Propelled Modular Transporters (SPMTs).

Rendering of module
Upstream execution
Upstream facilities will be delivered by world-class contractors supported by key equipment purchase orders. One contractor will lead subsea system design and fabrication, while another executes pipeline and subsea installation. The Operator will procure critical components, such as umbilicals, line pipe, and large-bore valves, for contractor installation, ensuring efficient, safe, and well-integrated delivery.
Afungi site preparation
Strategic pre‑investment in site readiness sets the foundation for project cost and schedule leadership. Early expansion of workforce accommodations and core infrastructure provides the capacity and stability needed before major construction accelerates. With the site prepared in advance, onshore work – earth works, foundations, modules, welding, pipe racks, tanks, utilities, and modular-unit integration – can proceed safely, efficiently, and without interruption.
Explore more about Rovuma LNG
-
Rovuma LNG project